Asset Tracking System UK | QR, RFID & GPS
The #1 Asset Tracking System.
Stop losing equipment, eliminate spreadsheet chaos, and pass every audit. itemit provides real-time visibility over your tools, IT hardware, and fixed assets.
Trusted by 1,000+ organisations globally to track 500,000+ assets.
Eliminate ghost assets: Know exactly what you have, where it is, and who has custody at all times.
Survive every audit: Maintain complete digital audit trails for regulatory and internal compliance.
Cut admin time by 80%: Replace error-prone spreadsheets with automated, real-time tracking.
Join these inspiring organisations that already love itemit
Up and Running in Three Steps.
Asset tracking that actually works in the field. No expensive consultants, no months-long rollout. Tag, scan, and manage from day one.
Attach a Tag to Any Asset
Attach a QR code, barcode, or RFID tag to any asset, from a laptop to a forklift. Order pre-printed tags directly from the itemit shop, or print your own in seconds. Each tag creates an instant, scannable digital record with full history, photos, and custom fields. No IT team or technical setup required. Most teams tag their first 100 assets in under an hour.
Scan Instantly with Any Smartphone
Scan any tag with the free itemit iOS or Android app. The moment you scan, itemit updates location, custody, and condition in real time, with no manual entry needed. Field teams can log issues, update status, and complete audits even when working offline; data syncs automatically the moment connectivity is restored. Works with mobile RFID readers and handheld scanners for bulk scanning.
Monitor Everything from One Dashboard
Your entire asset estate, visible from a single, secure cloud dashboard. Run instant audits, generate compliance reports, manage bookings and check-outs, and set automated maintenance alerts. Multi-site teams see every location in real time. Export to CSV or integrate via API with your ERP or finance systems. From 50 assets to 500,000+, itemit scales without friction.
Every Feature Your Team Actually Needs.
From QR scanning to enterprise RFID, from simple check-outs to advanced bookings, one asset management platform, built for the full asset lifecycle.
Track Anywhere with QR & GPS
Every asset gets a unique QR code or barcode, scannable in under a second with any smartphone camera. itemit supports unlimited QR scanning with no per-scan fees, making it practical for teams of any size. For assets on the move, pair itemit with compatible GPS trackers to view real-time location on an interactive map. Whether you need to locate a company vehicle across town or verify a tool is still on-site, GPS integration gives you the visibility that static spreadsheets can never provide. Pre-printed waterproof QR tags are available directly from the itemit shop, or generate and print your own for pennies each.
View Asset Tag Options →Advanced RFID Capabilities
For organisations that need to audit hundreds or thousands of assets in minutes rather than hours, itemit's RFID integration is a game-changer. Use your smartphone with a compatible mobile RFID reader to scan multiple tagged assets simultaneously without line-of-sight. Simply walk through a room and itemit logs every asset detected. For warehouse-scale operations, itemit supports dedicated handheld RFID readers that can capture 200+ assets per minute. RFID tags are ideal for high-value equipment rooms, server racks, PPE stores, and any environment where manual scanning creates a bottleneck. Combined with itemit's automatic discrepancy reports, RFID audits become a routine process rather than a quarterly ordeal.
Explore RFID Asset Tracking →Custody Tracking & Advanced Bookings
itemit's check-out system gives every asset a clear chain of custody, so you always know who has it, when they took it, and when it's due back. Overdue alerts fire automatically, eliminating the awkward chasing emails. The Advanced Bookings module takes this further, allowing teams to reserve specific equipment in advance through a self-service portal. Production crews can pre-book camera kits for a shoot next Tuesday. Field engineers can reserve specialist tools before travelling to a remote site. With booking conflicts surfaced in real time, double-bookings become impossible and equipment utilisation rates increase significantly. Customers typically see a 30% improvement in asset utilisation within three months of deployment.
See Equipment Check-Out Software →One-Tap Audits and Stocktakes
Replace your annual paper-based stocktake with mobile audits that your field team can run in minutes. Open the itemit app, select your location or category, and scan or tap your way through the asset list. Any asset not scanned is automatically flagged in a discrepancy report, with no manual cross-referencing required. itemit's offline mode means audits continue uninterrupted even in basements, warehouses, or remote sites with no signal. Data syncs the moment connectivity returns. Rapid cycle counting allows you to audit specific high-risk categories monthly instead of annually, catching ghost assets and losses before they escalate into write-offs. Finance teams consistently report audit times reduced by 70% or more.
View All Features →Preventive Maintenance Alerts
Equipment that isn't maintained costs more to repair and creates compliance liability. itemit's maintenance module lets you schedule recurring safety inspections, PAT tests, calibration checks, and service intervals for every asset individually. When a deadline approaches, the system sends automated alerts to the responsible person, removing the need to rely on someone to remember. For organisations operating under PUWER, LOLER, or OSHA regulations, itemit generates compliance-ready service histories on demand. Track which assets passed their last inspection, which are overdue, and which have been taken out of service. Safety managers across the NHS, utilities, and construction sectors rely on this module to reduce compliance risk and avoid costly regulatory penalties.
Explore PAT Testing Software →Custom PowerUps & Reporting
No two organisations manage assets the same way. itemit's PowerUps system lets you extend the platform with additional capabilities tailored to your exact workflow, without expensive custom development. Add depreciation tracking, insurance management, document storage, custom QR label designs, and more. The reporting engine lets you build custom dashboards that surface the metrics your team actually cares about: utilisation rates, maintenance backlog, asset value by location, or check-out frequency by team. Export any report to CSV or Excel in seconds, or use the itemit REST API to push data directly into your ERP, finance system, or Power BI dashboard. Enterprise teams manage 500,000+ assets on the same platform that works for a 50-asset SME.
Explore PowerUps & Integrations →See itemit in Action.
Watch how teams tag, track, and manage their assets in real time. From scanning a QR code to generating a full audit report, this is everything you need to see.

See how itemit works from tagging your first asset to running a full stocktake audit.
Track Any Asset, Any Industry.
From laptops to lathes, construction drills to classroom projectors. itemit adapts to your industry and your workflow.
IT Assets and Hardware
Production Equipment and Kit
Construction Tools and Equipment
NGO and Charity Asset Tracking
Schools and Education
Healthcare and Hospital Equipment
Trusted by 1,000+ Organisations.
From NHS trusts to engineering contractors, organisations with real asset management challenges choose itemit.
Wessex Water
"itemit replaced our spreadsheet nightmare across 200+ sites. We finally have visibility of everything, everywhere."
- Tracks 5,000+ assets across 200 sites
- 42 team members onboarded in 6 weeks
- Eliminated annual audit overruns
Smart Water Systems Team
Full storySAP Electrical
"The check-out system gave us complete accountability across our entire fleet of tools and test equipment."
- Full tool accountability across 3 depots
- Zero missing equipment on site audits
- Compliance reports generated in minutes
Operations Manager
Full storyAnglian Water
"itemit is a cost effective solution to what would otherwise be a very expensive problem for us."
- Replaced expensive legacy tracking system
- Real-time visibility across field teams
- Full GDPR compliance for data handling
Charlotte S., Smart Water System Engineer
Full storyWhy Organisations Choose itemit Over the Alternatives.
Generic trackers lack hardware integrations. Enterprise suites cost 10× more. Spreadsheets break at scale. itemit is the platform that does it all.
Recommended
itemit is the only platform combining enterprise-grade RFID and GPS hardware with a mobile-first app, at SME-friendly pricing, with no month-long rollout.
Plans from just £21/month
No hidden setup fees. No per-user charges. No lock-in contracts. Start with a free 14-day trial, no credit card required.
All Plans Include
- Unlimited users on every plan
- Free iOS and Android mobile apps
- QR code and barcode scanning included
- Complete digital audit trails
- Cloud dashboard with real-time visibility
- Global customer support team
Enterprise-Grade Compliance & Security.
Built for organisations where compliance isn't optional. itemit gives you the audit trails, access controls, and regulatory reporting that enterprise and regulated industries demand.
Financial Audit Readiness
Maintain an accurate fixed asset register with automated depreciation schedules, purchase cost tracking, and audit-ready financial reports. itemit gives finance teams and external auditors the real-time data they need to verify asset valuations, eliminating the scramble to reconcile spreadsheets at year-end. Export asset registers to CSV or connect via API to your accounting platform.
Safety Standards Compliance
Schedule mandatory equipment inspections and track compliance across global safety and regulatory standards including PUWER, LOLER, OSHA, and ISO requirements. itemit generates a complete service history for every asset, so when an inspector arrives, your compliance documentation is ready in seconds rather than hours. Automated alerts ensure no inspection deadline is ever missed.
Explore PAT Testing Software →GDPR & Data Privacy
Enterprise-grade encryption protects all data in transit and at rest. itemit is fully GDPR compliant, with data residency options for EU and UK-based organisations. Role-based access controls ensure that personal data, including user check-out history and location data, is only accessible to authorised personnel. Data Processing Agreements are available on request for enterprise deployments.
Secure Access Controls
Role-based access controls ensure your staff only see the assets and data they are authorised to manage. Create custom permission levels for field workers, team managers, and administrators. SSO (Single Sign-On) integration is available for enterprise accounts, ensuring login security meets your organisation's IT policy requirements. All user activity is logged with a full, immutable audit trail.
£98.6B
Lost to manual errors annually
94%
Spreadsheets contain errors
80%
Less admin time with itemit
Calculate Your ROI
Discover exactly how much your organisation could save by switching from manual tracking to itemit. Use our free ROI calculator to see your personalised cost savings.
Frequently Asked Questions About Asset Tracking.
Everything you need to know about asset tracking software.
Asset tracking software is a centralised digital system that allows organisations to monitor the real-time location, status, custody, and maintenance history of physical equipment, tools, IT hardware, and fixed assets. It typically uses technologies like QR codes, barcodes, RFID, or GPS tags attached to assets, combined with mobile apps and a cloud dashboard to give complete visibility over an asset estate, replacing manual spreadsheets with accurate, automated records.
Asset tracking software works in three steps. First, a unique identifier, such as a QR code, barcode, or RFID tag, is attached to each asset. Second, users scan the tag with a smartphone or dedicated reader to update the asset's location, custody, or condition in real time. Third, all data flows into a cloud dashboard where managers can view their entire estate, run reports, manage bookings, and trigger maintenance alerts. itemit supports all three stages from a single platform, with offline capability for field teams.
itemit plans start from £21 per month and include unlimited users, the iOS and Android mobile apps, QR and barcode scanning, and complete audit trails. There are no per-user fees and no hidden setup costs. RFID capabilities, Advanced Bookings, and enterprise integrations are available on higher plans. A free 14-day trial is available with no credit card required, so you can test the full system risk-free before committing.
Asset tracking focuses on individual, uniquely identifiable items, such as a specific laptop, a particular forklift, or a named piece of medical equipment, tracking its location, condition, custody, and maintenance history over its full lifecycle. Inventory management focuses on quantities of interchangeable stock, for example 500 units of a component or 1,000 boxes of a product. itemit is designed for asset tracking, where each item has a unique identity and history, though it can also support consumables and stock management.
Yes. itemit has free native apps for both iOS and Android. The app turns any smartphone into a QR code and barcode scanner, allowing field teams to scan assets, update locations, log maintenance issues, complete audits, and process check-outs and check-ins, all from their phone. The app also works fully offline, storing data locally and syncing automatically when a connection is restored. This makes it ideal for warehouse, construction, and remote field operations.
itemit supports four types of asset identification: QR codes (scannable with any smartphone camera), barcodes (including 1D and 2D formats), RFID tags (passive and active, with compatible mobile or handheld RFID readers), and GPS trackers (for real-time live location of vehicles and high-value mobile assets). Pre-printed waterproof QR and barcode labels are available from the itemit shop. You can also print your own labels and import your existing barcodes. Most teams use a combination depending on the asset type and use case.
Yes. itemit is built on enterprise-grade cloud infrastructure with full encryption for data in transit and at rest. The platform is GDPR compliant with data residency options available for UK and EU organisations. Role-based access controls ensure staff only see assets and data relevant to their role. All user actions are recorded in an immutable audit log. Data Processing Agreements are available for enterprise customers, and SSO integration is supported for organisations with strict IT security policies.
Most itemit customers are fully operational within days, not months. The typical journey is: sign up for a free trial, import your existing asset list (via CSV or manual entry), attach tags to assets, and start scanning. The mobile app is intuitive enough that field staff require minimal training. For enterprise deployments with RFID integration, API connections to ERP systems, or custom PowerUps, implementation typically takes two to four weeks with support from the itemit customer success team.
Yes. itemit's mobile app for iOS and Android supports most core operations offline. Field engineers, construction workers, and warehouse teams can scan assets, complete audits, update locations, and log issues even without an internet connection. Data is stored locally on the device and syncs automatically the moment connectivity is restored. This is particularly valuable for basement server rooms, remote construction sites, underground infrastructure, and any environment where reliable signal cannot be guaranteed.
The return on investment from asset tracking software comes from four areas: eliminating ghost assets (assets that appear on the books but are lost, stolen, or written off), reducing time spent on manual audits and admin (teams consistently report 70%+ time savings), preventing equipment loss and replacement cost, and avoiding regulatory fines from missed maintenance or inspection deadlines. Use the itemit ROI calculator to generate a personalised cost savings estimate based on your asset count and current admin hours.
Further Reading.
Deepen your understanding of asset tracking technology and best practices.